Special development for Hegner Kanalreinigung AG

Gully maintenance

Delivery December 2018

The vehicle was specially designed for gully emptying and re-filling.

The gullies are refilled with clean water.

  • Newly developed deviding wall system
  • Total volume more than 19’000 Liters
  • High pressure pumpe HPT 70R – 400 l/min
  • Vacuum pump VPC 83 – 4000 m3/h
  • Double-Telescopic-Suction Boom
  • Hose reel D32 with telescope

You may also like

More news